A scaffold used for construction should be inspected before it is used for the first time and then every 7 days, until it is removed. It should also be inspected each time it is exposed to conditions likely to cause deterioration e.g. following adverse weather conditions or following substantial alteration.
For more information see the [National Access and Scaffolding Confederation website ](http://www.nasc.org.uk/).