Assuming the CAR was a required insurance, if it is not provided then the Employer can obtain it and the cost is to be met by the Contractor (clause 86.1)
Assuming the CAR was a required insurance, if it is not provided then the Employer can obtain it and the cost is to be met by the Contractor (clause 86.1)